Stewart Urgent Care

Healthcare

West Jordan, Utah (2018)

Healthcare

Project Cost: $1 Million

Duration: 5 Months

Project Overview

A major TI project by Cook Builders established an integrated center focused on high-efficiency medical layouts and specialized diagnostic
equipment.

Scope & Highlights

  • Build-outs included specialized exam rooms, triage areas, and on-site diagnostic labs.
  • A core part of the TI was the installation of Lead-lined X-ray rooms and the heavy electrical infrastructure needed for modern imaging equipment.

Outcome

The TIs were designed to house both urgent care and primary care functions within a single footprint. This required separate check-in workflows for walk-ins versus scheduled appointments.