Skip to content
← All projects

Industrial & Distribution

Metro

Duration: 18 monthsLocation: Salt Lake City, Utah
Metro — Cook Builders project

This industrial facility supports advanced electrical magnetic sorting and scrap metal processing operations. The project required careful sequencing, heavy equipment coordination, and robust utility integration.

Scope & highlights

The outcome

A purpose-built industrial facility designed for long-term output and reliability.

On the ground

Metro — project photo 1

More Cook work and local permitting info for Salt Lake City →

The Owner’s Manual / Field notes

Planning a similar space?

Start with how the space needs to work, the existing conditions and your opening target. Our owner’s guide explains the decisions to bring to the first conversation.

Read the project owner’s guide →
Cook / Field studiesA closer look
Industrial and distributionAxonometric warehouse diagram with steel bays, three loading docks, rooftop equipment, panel joints, safety bollards, and a glazed office entrance.
Illustrative architecture. Explore the guide for scope, coordination and owner questions.

Building something like this?

A real person from Cook calls you back within one business day.