
Tenant improvements · Utah
Cook Builders is a Utah commercial general contractor for office, medical, retail and restaurant build-outs, from bare shell or second-gen space to move-in day.
Three fields. We ask the right questions on the call.
Rather talk now? 801.295.3060
What we build
Open-plan refreshes, private offices, conference and training rooms, full-floor headquarters.
Exam rooms, plumbing-heavy layouts, med gas and the inspections that come with clinical space.
Storefronts, fixtures and brand standards, built to hit an opening date.
Kitchens, hoods, grease and health-department sign-off, from second-gen space or a white box.
Re-use what works in an existing space and change what doesn't, without paying for a gut job.
Demising walls, base systems and spec finishes so a vacant suite is ready to lease.
Before you sign the lease
The cheapest time to find a problem is before the lease is signed. We walk the space, lay out your program, and price it against the landlord's allowance, so you know what you'll owe out of pocket and what to push back on in the work letter.
Already signed? Same process, just faster. Bring the floor plan and the work letter and we'll take it from there.
How it works
Your program laid out in the real space, priced against your TI allowance before you commit.
Work letter, building rules, insurance and landlord sign-offs handled early.
Drawings scoped to pass city review, with long-lead equipment ordered in parallel.
Phased around your business if you're open; full speed if you're not.
Inspections closed, punch list done, keys handed over on your move date.
Past builds
Questions we always get
Your lease usually funds part of the build-out. We price your plan against the allowance early, document costs the way landlords require so draws release cleanly, and flag anything the allowance won't cover before you sign off.
Yes, if you can. A test-fit and budget before you sign tells you whether the space and the allowance actually work, and gives you leverage on the landlord's work letter.
Yes. We phase the work, schedule loud and dusty scope after hours, and leave the space clean and safe at the end of every shift.
Simple suites can move in weeks once permitted; larger or medical spaces take months. Permits and long-lead items such as storefront glass, HVAC equipment and millwork set the pace, so we start on those in preconstruction.
We do: city permits and inspections, landlord approvals, certificates of insurance, elevator and dock bookings, and noise windows.
Small suites to full floors and multi-site programs. If you're not sure your project is a fit, call and ask. It takes two minutes.
We're based in Centerville and build across the Wasatch Front and the rest of Utah, plus multi-state programs for national brands.
Three fields, no project essay. Or call 801.295.3060.